Vacuum Chamber V2

The upgrades and updates are here! The previous vacuum chamber suffered quality of life and pumping issues. By implementing the following upgrades I was able to dramatically increase performance and ease of use:

  • Double Gasketed Windows (Better Sealing)
  • 1″ NPT Flange Air Inlets (Faster Pumping)
  • Removed Alignment Pins (Unnecessary)
  • Removed operations ex. window shelf (dangerous and added expense.)
  • Bolt errors corrected

By implementing these changes the chamber the chamber reached:

Loader Loading…
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

In the future I plan to switch to bolted ISO to KF adapters for the air inlet, as Teflon Tape was having trouble sealing at the 1″ KF scale. I also plan on redesigning the system from scratch in Onshape, to make the system more accessible and add parametric design.

Thanks for checking all this out, if you see any information missing make sure to check out the previous version or reach out!